Structured cabling

Structured cabling

New drops, labor-only runs, terminations and testing.

On-site Fixed price 3 phases

Overview

Delivery
On-site
Pricing
Fixed pricePriced from your answers before work starts.
Agreements
3 signed onlineFrom your customer portal
Equipment
You supply it · We procure it

Always included

  • Cable schedule and test results

Added when your answers need it

  • Site walk and cabling design
  • Cabling plan and fixed quote
  • Pathway planning and labeling scheme
  • Remove abandoned cable
  • Install patch panels
  • Pull and dress cable
  • Terminate, label and patch
  • Firestop penetrations
  • Continuity and wiremap testing
  • Certification testing with report
  • Trace and test problem cables
  • Repairs (scope confirmed after testing)
  • Certify existing cabling
  • Coordination with your internal IT team
  • Coordination with the other contractor
  • Knowledge transfer to your IT team
  • Shutdown / maintenance-window planning

Phases and process

  1. Phase 1 Discovery, Documentation, Validation

    • Site walk and cabling designWalk the site, confirm outlet locations, pathways and telecom room capacity. If applicable
    • Cabling plan and fixed quoteDrop schedule, pathway plan and a fixed price for the installation phase. If applicable
    • Pathway planning and labeling schemeConfirm routes, labeling scheme and patch panel port assignments. If applicable
    • Trace and test problem cablesTone, trace and test the reported cables to find faults. If applicable
    • Certify existing cablingCertification testing of your existing drops with a per-drop report and a list of failures. If applicable
    • Coordination with your internal IT teamAgree responsibilities, access, change approvals and handoff points with your IT team. If applicable
    • Coordination with the other contractorSequence work with the other contractor so neither team waits on the other. If applicable
    • Shutdown / maintenance-window planningSplit the work into windows, confirm dates against your production schedule and plan rollback for each window. If applicable
  2. Phase 2 Installation

    • Remove abandoned cableRemove old, unused cable from ceilings and pathways (code requirement for abandoned cable). If applicable
    • Install patch panelsMount new patch panels and cable management in the rack. If applicable
    • Pull and dress cablePull cable along the planned pathways and support it to code. If applicable
    • Terminate, label and patchTerminate both ends, label outlets and panel ports. If applicable
    • Firestop penetrationsSeal every penetration through fire-rated walls or floors with listed firestop. If applicable
    • Repairs (scope confirmed after testing)Re-terminate or replace faulty runs found during testing. If applicable
  3. Phase 3 Validation, Documentation

    • Continuity and wiremap testingEvery drop is tested for continuity and correct pin-out. If applicable
    • Certification testing with reportCategory performance certification of each drop with a per-drop test report. If applicable
    • Cable schedule and test resultsDrop schedule, labeling map and test results. Required
    • Knowledge transfer to your IT teamWalkthrough of the finished work, configuration and support procedures for your IT staff. If applicable

Required steps are part of every project; “if applicable” steps are added or left out based on your answers in the estimator.

Equipment options

Choose in the estimator how the equipment for this service is sourced.

  • You supply it

    We install and configure equipment you already own.

    • Cable, jacks, faceplates and patch panels
  • We procure it

    We purchase the models you specify and include them in the quote.

    • Patch panels (24-port) and cable management

Configure and estimate

Answer the questions for an instant estimate, then add the configured service to your project. Nothing is saved until you add it.

New drops, labor-only installs, re-cabling, moves/adds/changes, troubleshooting and certification. Drops are priced per run; difficult pathways, CAT6A and firestopping are added only when they apply.

One drop = one cable from the telecom room to one jack. A dual-jack outlet is two drops.

Ethernet channels are limited to 100 m (328 ft) including patch cords.

Leave 0 if none or unknown; we confirm on site.

Continuity testing is always included. Certification adds a performance report (often required for manufacturer warranties).

Which outlets, what fails (no link, slow, intermittent) and since when.

A rough number is fine — the site walk confirms it.

We do the whole job and coordinate only with your main contact.

What will your IT team handle?

We plan handoffs and change windows around these responsibilities.

A walkthrough of what was built, how it is configured and how to support it.

For example: electrical, low-voltage cabling, equipment vendor, general contractor.

Scheduling calls and walkthroughs to sequence the work (about one hour each).

Choose Yes when ceilings or work areas are only accessible while production or offices are closed.

Each window is a separate visit; travel and mobilization apply per visit.

Access constraints, preferred timing, special requirements. Never include passwords or other secrets.

You will sign in or create a free account, then this service is added to your project draft with your answers.

Questions about this service

When is my quote reviewed by an engineer?

Standard configurations are priced and issued automatically. An engineer reviews the quote first when:

  • Drop count, pathways and price are confirmed after the site walk.
  • Repairs are confirmed after the cables are traced and tested.
  • Runs over 250 ft may exceed the 100 m channel limit — an engineer confirms the pathways.
  • Wall fishing and conduit work are confirmed on site before the quote is issued.
  • Large cabling project — owner approval required.
  • Work windows are confirmed against your production schedule before the quote is issued.
What do I sign before work starts?
  • Service terms and conditions
  • Statement of work
  • Equipment purchase authorization (only when it applies to your project)

Everything is signed online from your customer portal.

Is the online estimate a binding price?

No. Estimates use our published rates; travel, taxes and site specifics are confirmed in your quote.

Can I combine this with other services?

Yes. Add this service to your project, then add other services and locations in the project builder to receive one quote.