Structured cabling
Structured cabling
New drops, labor-only runs, terminations and testing.
Overview
- Delivery
- On-site
- Pricing
- Fixed pricePriced from your answers before work starts.
- Agreements
- 3 signed onlineFrom your customer portal
- Equipment
- You supply it · We procure it
Always included
- Cable schedule and test results
Added when your answers need it
- Site walk and cabling design
- Cabling plan and fixed quote
- Pathway planning and labeling scheme
- Remove abandoned cable
- Install patch panels
- Pull and dress cable
- Terminate, label and patch
- Firestop penetrations
- Continuity and wiremap testing
- Certification testing with report
- Trace and test problem cables
- Repairs (scope confirmed after testing)
- Certify existing cabling
- Coordination with your internal IT team
- Coordination with the other contractor
- Knowledge transfer to your IT team
- Shutdown / maintenance-window planning
Phases and process
-
Phase 1 Discovery, Documentation, Validation
- Site walk and cabling designWalk the site, confirm outlet locations, pathways and telecom room capacity. If applicable
- Cabling plan and fixed quoteDrop schedule, pathway plan and a fixed price for the installation phase. If applicable
- Pathway planning and labeling schemeConfirm routes, labeling scheme and patch panel port assignments. If applicable
- Trace and test problem cablesTone, trace and test the reported cables to find faults. If applicable
- Certify existing cablingCertification testing of your existing drops with a per-drop report and a list of failures. If applicable
- Coordination with your internal IT teamAgree responsibilities, access, change approvals and handoff points with your IT team. If applicable
- Coordination with the other contractorSequence work with the other contractor so neither team waits on the other. If applicable
- Shutdown / maintenance-window planningSplit the work into windows, confirm dates against your production schedule and plan rollback for each window. If applicable
-
Phase 2 Installation
- Remove abandoned cableRemove old, unused cable from ceilings and pathways (code requirement for abandoned cable). If applicable
- Install patch panelsMount new patch panels and cable management in the rack. If applicable
- Pull and dress cablePull cable along the planned pathways and support it to code. If applicable
- Terminate, label and patchTerminate both ends, label outlets and panel ports. If applicable
- Firestop penetrationsSeal every penetration through fire-rated walls or floors with listed firestop. If applicable
- Repairs (scope confirmed after testing)Re-terminate or replace faulty runs found during testing. If applicable
-
Phase 3 Validation, Documentation
- Continuity and wiremap testingEvery drop is tested for continuity and correct pin-out. If applicable
- Certification testing with reportCategory performance certification of each drop with a per-drop test report. If applicable
- Cable schedule and test resultsDrop schedule, labeling map and test results. Required
- Knowledge transfer to your IT teamWalkthrough of the finished work, configuration and support procedures for your IT staff. If applicable
Required steps are part of every project; “if applicable” steps are added or left out based on your answers in the estimator.
Equipment options
Choose in the estimator how the equipment for this service is sourced.
-
You supply it
We install and configure equipment you already own.
- Cable, jacks, faceplates and patch panels
-
We procure it
We purchase the models you specify and include them in the quote.
- Patch panels (24-port) and cable management
Configure and estimate
Answer the questions for an instant estimate, then add the configured service to your project. Nothing is saved until you add it.
New drops, labor-only installs, re-cabling, moves/adds/changes, troubleshooting and certification. Drops are priced per run; difficult pathways, CAT6A and firestopping are added only when they apply.
You will sign in or create a free account, then this service is added to your project draft with your answers.
Questions about this service
When is my quote reviewed by an engineer?
Standard configurations are priced and issued automatically. An engineer reviews the quote first when:
- Drop count, pathways and price are confirmed after the site walk.
- Repairs are confirmed after the cables are traced and tested.
- Runs over 250 ft may exceed the 100 m channel limit — an engineer confirms the pathways.
- Wall fishing and conduit work are confirmed on site before the quote is issued.
- Large cabling project — owner approval required.
- Work windows are confirmed against your production schedule before the quote is issued.
What do I sign before work starts?
- Service terms and conditions
- Statement of work
- Equipment purchase authorization (only when it applies to your project)
Everything is signed online from your customer portal.
Is the online estimate a binding price?
No. Estimates use our published rates; travel, taxes and site specifics are confirmed in your quote.
Can I combine this with other services?
Yes. Add this service to your project, then add other services and locations in the project builder to receive one quote.