Fiber infrastructure
Fiber infrastructure
Backbone fiber runs, terminations and testing.
Overview
- Delivery
- On-site
- Pricing
- Fixed pricePriced from your answers before work starts.
- Agreements
- 3 signed onlineFrom your customer portal
- Equipment
- You supply it · We procure it · We recommend it
Phases and process
-
Phase 1 Discovery, Coordination
- Route walk and pathway verificationWalk each route, confirm pathways, conduit fill and enclosure locations.
- Locate the fiber faultOTDR and visual fault location on the affected links.
- Site evaluation and fiber planEvaluate buildings, pathways and requirements and produce a fiber plan and fixed quote.
- Coordination with your internal IT teamAgree responsibilities, access, change approvals and handoff points with your IT team.
- Coordination with the other contractorSequence work with the other contractor so neither team waits on the other.
- Shutdown / maintenance-window planningSplit the work into windows, confirm dates against your production schedule and plan rollback for each window.
-
Phase 2 Installation, Configuration
- Install fiber cable and innerductPlace innerduct and fiber cable along the verified route with slack loops and labeling.
- Install fiber enclosuresMount fiber enclosures or patch panels at each end.
- Splice / terminate strandsFusion-splice pigtails, install field connectors or land pre-terminated assemblies, as selected.
- Repair (scope confirmed after locating the fault)Re-splice, re-terminate or replace the damaged section.
- Connect fiber to network equipmentInstall optics or media converters, patch and confirm link at the right speed.
- Fiber installation (estimate — fixed after evaluation)Indicative installation effort; replaced by a fixed quote after the evaluation.
-
Phase 3 Validation, Documentation
- Loss testing (power meter / light source)End-to-end insertion-loss test of every strand against the link budget.
- OTDR tracesOTDR trace of every strand to locate splices, bends and events.
- As-built and test documentationRoute drawings, strand map, labels and test results.
- Knowledge transfer to your IT teamWalkthrough of the finished work, configuration and support procedures for your IT staff.
The steps in your quote are tailored to your answers: steps that do not apply to your project are left out.
Equipment options
Choose in the estimator how the equipment for this service is sourced.
-
You supply it
We install and configure equipment you already own.
- Optics / media converters
-
We procure it
We purchase the models you specify and include them in the quote.
- Fiber cable and innerduct (per verified route)
- Fiber enclosures / patch panels
- Optics / media converters (customer-specified models)
-
We recommend it
We size and select the equipment from your answers or a survey, then procure it.
- Compatible optics (recommended by InfiniTech Dynamics)
Configure and estimate
Answer the questions for an instant estimate, then add the configured service to your project. Nothing is saved until you add it.
New backbone links, terminations, testing and repair. Labor is estimated from links, strands and route conditions; cable, enclosures and optics are supplier-priced. Underground routes and unknown scopes start with an evaluation.
You will sign in or create a free account, then this service is added to your project draft with your answers.
Questions about this service
When is my quote reviewed by an engineer?
Standard configurations are priced and issued automatically. An engineer reviews the quote first when:
- Fiber routes and price are confirmed after the site evaluation.
- The repair is confirmed after the fault is located.
- Underground routes need a route survey and a subcontracted boring quote.
- Fiber type and connectors are identified on site before the quote is issued.
- Long or multi-link backbones are reviewed by an engineer before issue.
- Large fiber project — owner approval required.
- Work windows are confirmed against your production schedule before the quote is issued.
What do I sign before work starts?
- Service terms and conditions
- Statement of work
- Equipment purchase authorization (only when it applies to your project)
Everything is signed online from your customer portal.
Is the online estimate a binding price?
No. Estimates use our published rates; travel, taxes and site specifics are confirmed in your quote.
Can I combine this with other services?
Yes. Add this service to your project, then add other services and locations in the project builder to receive one quote.