Server infrastructure

Server infrastructure

Server deployment, virtualization and migrations.

Remote or on-site Estimated hourly 3 phases

Overview

Delivery
Remote or on-site
Pricing
Estimated hourlyEstimated from published hourly rates; billed for time worked.
Agreements
3 signed onlineFrom your customer portal
Equipment
You supply it · We procure it · We recommend it

Phases and process

  1. Phase 1 Discovery, Procurement, Documentation

    • Design and sizingSize compute, storage, licensing and backup for the workloads.
    • Hardware and license procurementOrder and verify server hardware and licenses.
    • Server health checkReview hardware health, capacity, patching, backups and security configuration.
    • Findings and recommendationsPrioritized findings and a remediation plan.
    • Server troubleshootingDiagnose the reported problem from logs, performance data and configuration.
    • Coordination with your internal IT teamAgree responsibilities, access, change approvals and handoff points with your IT team.
    • Coordination with the other contractorSequence work with the other contractor so neither team waits on the other.
    • Shutdown / maintenance-window planningSplit the work into windows, confirm dates against your production schedule and plan rollback for each window.
  2. Phase 2 Installation, Configuration

    • Rack and cable the server(s)Mount, power, cable and label each server; configure out-of-band management.
    • Operating system / hypervisor installationFirmware updates, OS or hypervisor installation and hardening.
    • Virtualization configurationVirtual networking, storage, clustering and high availability.
    • Server roles and servicesDomain controller, file, print, RDS, SQL or application roles as selected.
    • Create or move virtual machinesBuild or migrate the listed virtual machines onto the new host(s).
    • Workload and data migrationMigrate servers and data with verification at each step.
    • Windows Server upgrade / role migrationUpgrade in place or migrate roles to a new server, then decommission the old one.
    • CutoverFinal sync, DNS and client changes, and rollback plan.
    • Backup and disaster-recovery setupBackup jobs, retention, offsite/immutable copies and alerting.
    • Remediation (scope confirmed by the health check)Estimated corrective work from the findings.
    • Remediation (scope confirmed after diagnosis)Estimated corrective work, confirmed from the diagnosis.
  3. Phase 3 Validation, Documentation

    • Documented restore testRestore a sample of servers and files and record recovery times.
    • Validation and handover testsVerify services, failover, backups and user access.
    • Documentation and runbooksServer inventory, configuration, credentials handover process and recovery runbook.
    • Knowledge transfer to your IT teamWalkthrough of the finished work, configuration and support procedures for your IT staff.

The steps in your quote are tailored to your answers: steps that do not apply to your project are left out.

Equipment options

Choose in the estimator how the equipment for this service is sourced.

  • You supply it

    We install and configure equipment you already own.

    • Server hardware
  • We procure it

    We purchase the models you specify and include them in the quote.

    • Server hardware
  • We recommend it

    We size and select the equipment from your answers or a survey, then procure it.

    • Server hardware (recommended by InfiniTech Dynamics)
    • Backup appliance / NAS

Configure and estimate

Answer the questions for an instant estimate, then add the configured service to your project. Nothing is saved until you add it.

New servers, virtualization, migrations (including to the cloud), Windows Server upgrades, backup and disaster recovery, health checks and troubleshooting. An engineer confirms every server quote before it is issued.

Which roles run on the server(s)?

Many line-of-business vendors must install or certify their software themselves.

We do the whole job and coordinate only with your main contact.

What will your IT team handle?

We plan handoffs and change windows around these responsibilities.

A walkthrough of what was built, how it is configured and how to support it.

For example: electrical, low-voltage cabling, equipment vendor, general contractor.

Scheduling calls and walkthroughs to sequence the work (about one hour each).

Choose Yes when servers cannot be down during working hours.

Each window is a separate visit; travel and mobilization apply per visit.

Access constraints, preferred timing, special requirements. Never include passwords or other secrets.

You will sign in or create a free account, then this service is added to your project draft with your answers.

Questions about this service

When is my quote reviewed by an engineer?

Standard configurations are priced and issued automatically. An engineer reviews the quote first when:

  • Server work is confirmed by an engineer before issue.
  • Remediation is confirmed from the findings.
  • Application vendor involvement is coordinated before the quote is issued.
  • Large server project — owner approval required.
  • Work windows are confirmed against your production schedule before the quote is issued.
What do I sign before work starts?
  • Service terms and conditions
  • Statement of work
  • Equipment purchase authorization (only when it applies to your project)

Everything is signed online from your customer portal.

Is the online estimate a binding price?

No. Estimates use our published rates; travel, taxes and site specifics are confirmed in your quote.

Can I combine this with other services?

Yes. Add this service to your project, then add other services and locations in the project builder to receive one quote.