Production kiosks & dashboards

Production kiosks & dashboards

Shop-floor kiosks and production dashboards.

On-site Fixed price 3 phases Signed online

Service configurator

Configure your production kiosks & dashboards project

  1. 1Configure
  2. 2Review estimate
  3. 3Add to project
  4. 4Quote, sign & schedule

Your estimate updates as you answer. Questions adapt to your answers, and your answers stay on this device until you add the service to a project.

Shop-floor kiosks, locked-down stations and production dashboards — with your hardware or hardware we buy — including mounting, scanners and badge readers, and remote management.

Devices at each station

We do the whole job and coordinate only with your main contact.

What will your IT team handle?

We plan handoffs and change windows around these responsibilities.

A walkthrough of what was built, how it is configured and how to support it.

For example: electrical, low-voltage cabling, equipment vendor, general contractor.

Scheduling calls and walkthroughs to sequence the work (about one hour each).

Choose Yes when stations at machines can only be installed while the line is down.

Each window is a separate visit; travel and mobilization apply per visit.

Access constraints, preferred timing, special requirements. Never include passwords or other secrets.

Overview

Delivery
On-site
Pricing
Fixed pricePriced from your answers before work starts.
Agreements
3 signed onlineFrom your customer portal
Equipment
You supply it · We procure it · We recommend it

Always included

  • Station planning
  • Kiosk profile and lockdown
  • Operator validation
  • Station list and support notes

Added when your answers need it

  • Hardware procurement
  • Dashboard build
  • Remove existing stations
  • Mount stations
  • Install and configure stations
  • Remote lockdown of existing PCs
  • Connect scanners, badge readers and printers
  • Enroll stations in Intune
  • Coordination with your internal IT team
  • Coordination with the other contractor
  • Knowledge transfer to your IT team
  • Shutdown / maintenance-window planning

Phases and process

  1. Phase 1 Discovery, Procurement, Configuration

    • Station planningConfirm locations, mounting, power, network and the application for each station. Required
    • Hardware procurementOrder and verify kiosk hardware, mounts and enclosures. If applicable
    • Kiosk profile and lockdownBuild the locked-down kiosk configuration (single-app, multi-app or browser). Required
    • Coordination with your internal IT teamAgree responsibilities, access, change approvals and handoff points with your IT team. If applicable
    • Coordination with the other contractorSequence work with the other contractor so neither team waits on the other. If applicable
    • Shutdown / maintenance-window planningSplit the work into windows, confirm dates against your production schedule and plan rollback for each window. If applicable
  2. Phase 2 Configuration, Installation

    • Dashboard buildBuild production dashboards from your data source. If applicable
    • Remove existing stationsRemove and label the old stations. If applicable
    • Mount stationsWall, pole/arm or cart mounting at each station. If applicable
    • Install and configure stationsInstall hardware, apply the kiosk profile and connect to the network. If applicable
    • Remote lockdown of existing PCsApply the kiosk profile remotely to existing PCs. If applicable
    • Connect scanners, badge readers and printersConnect and test the selected input devices at each station. If applicable
    • Enroll stations in IntuneKiosk policies and remote management through Intune. If applicable
  3. Phase 3 Validation, Documentation

    • Operator validationOperators confirm each station works with the application and devices. Required
    • Station list and support notesStation list, configuration and recovery steps. Required
    • Knowledge transfer to your IT teamWalkthrough of the finished work, configuration and support procedures for your IT staff. If applicable

Required steps are part of every project; “if applicable” steps are added or left out based on your answers in the configurator.

Equipment options

Choose in the configurator how the equipment for this service is sourced.

  • You supply it

    We install and configure equipment you already own.

    • Kiosk PCs / displays
  • We procure it

    We purchase the models you specify and include them in the quote.

    • Kiosk hardware
    • Mounting hardware
  • We recommend it

    We size and select the equipment from your answers or a survey, then procure it.

    • Kiosk hardware (recommended by InfiniTech Dynamics)

Questions about this service

When is my quote reviewed by an engineer?

Standard configurations are priced and issued automatically. An engineer reviews the quote first when:

  • Washdown enclosures and placement are confirmed on site before issue.
  • Dashboard data sources are confirmed by an engineer before issue.
  • Recommended hardware is confirmed with you before purchase.
  • Large kiosk rollout — owner approval required.
  • Work windows are confirmed against your production schedule before the quote is issued.
What do I sign before work starts?
  • Service terms and conditions
  • Statement of work
  • Equipment purchase authorization (only when it applies to your project)

Everything is signed online from your customer portal.

Is the online estimate a binding price?

No. Estimates use our published rates; travel, taxes and site specifics are confirmed in your quote.

Can I combine this with other services?

Yes. Add this service to your project, then add other services and locations in the project builder to receive one quote.